On behalf of our main partner Valsamis Inc., we managed the dry dock of CCL Venezia at Navantia Shipyard in Cadiz, Spain.
We operated as PM for the partial and totally replacement of some of the existing AC Units.
Main activities was:
- new ACS installation to feed the new Galley dedicated for the Italian Restaurant on deck 5; new cold and hot water line routing from the main manifold located on deck 6 to the new ACS;
- new supply and exhaust lines to/from the new galley on deck 5;
- new exhaust line installation inway of Aft Engine Casing, from deck 5 to deck 14, where the new exhaust fan have been located;
- new fresh air intake louver installation, on deck 4, and inlet line arrangement up to new ACS on deck 5;
- new Italian Restaurant H-Vac system modification;
- new Fancoil installation on deck 12, to support the modified Arcade zone;
- various existing ACS modification.
The dry dock lasted almost two months.