COSTA Mediterranea – Refit Survey

A week on board of Costa Mediterranea to survey the refit of cross flooding valves systems.

Two of the existing manual systems have been totally dismantled, checked, repaired where necessary, and reinstalled.
A team of three technician of Valsamis Inc. had been engaged to perform the job, during available cruise time slots; the dry tank, inside which  the valves are located, was open (and then accessible), only with the vessel moored in port.

Veni, vidi, vici.